Thank you, Mr. Chair. On the 2016-2017, we're just finishing up the brushing and drainage culvert replacements. What we need for the 2017-2018, we're going to do surface gravel from kilometre 30 to 70 and brushing from 154 to 159, and serving and design kilometre 143 to 154. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. Since actually the Member has asked questions in the House, we've had consultation with the City of Yellowknife on the access road to the city, and we've presented a plan and had conversation with him about putting a trail from the power generation power utility piece there close to Niven and a trail along the side of the highway in front of Nova with a crosswalk, and we're just waiting to hear back from the City of Yellowknife. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. That will all happen before next season, so probably next spring. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Yes, I would.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. The challenge moving forward is to get enough funding to do all these sections of roads across the Northwest Territories, and as we move forward we will try to round up the funding that we can do this section of road. But moving forward in the short-term, there is no money to do this section. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Mr. Speaker, I wish to table the following document entitled "Government of the Northwest Territories Contracts over $5,000 Report for the Fiscal Year Ending March 31, 2016." Thank you, Mr. Speaker.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. Proposed work for 2017-2018 is embankment widening improvements at kilometre 379 to 375, which is involving aggregate production, widening, strengthening and surface preparation. Drainage improvements also on the same kilometres, 379 to 375. Correction, aggregate production in pit at kilometres 389 to 375.6, and then again chip seal is going to be done on the same section, 395 to 375. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. Yes, the Jean Marie, if you want to talk about that specific bridge, the pre-engineering design and tender will be done in 2016-2017 and construction will be done in 2017-2018. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. The Member is absolutely correct, calcium chloride is what we use on the highways, EK35 is used on runways due to the nature that it doesn't corrode the aircraft. Calcium chloride is significantly cheaper than EK35. Thank you, Mr. Chair.

Debates of , 18th Assembly, 2nd Session (day 40)

Thank you, Mr. Chair. We want to actually proceed with this work and we want to try to actually proceed and have the work done in the next couple of months. Thank you, Mr. Chair.